MON-FRI 7.30AM-5PM:
UK +44(0)1254936950
30 bays.
Looking the part.
Down the line.
PC install day.
Program bay.
Program Bay 2
Special tools 2.
Double bay unit.
Special tools drawers.
Planning stage.
A huge workshop and big statement for the Bowker motor group. All the stations were carefully designed from the beginning to allow for possible future alterations. Diagnostic PC,s, lift controls and oil monitoring all built in.
Also commissioned were a set of vertical drawers for the ever expanding BMW special tools. Again designed to be added to when needed. The drawers were made to fit the original BMW perforated panels and shadow sets.